October 18, 2024 | Dallas, TX
Our Technicians, Clark Hise and Seth Polley, pulled a 6-strand OM4 Multimode Fiber, connecting the two IT closets. The pull was routine and no major hurdles were encountered. Once the fiber was secured, it was tested and certified with our OWL tester. We enjoyed doing business with the Department of ...
October 8, 2024 | McKinney, TX
We pulled two data cables and installed two Wi-Fi access points. The employees at this location let it be known that Wi-Fi coverage up until this point had been spotty and were grateful to have a new system in place. Once the APs had been installed, our technician worked with ...
September 27, 2024 | Dallas, TX
After arriving on-site, our technician tested the cable with our Fluke DSX-5000 tester. The test result confirmed that the cable met the appropriate standards. To remove any doubt, the technician replaced both ends of the data cable and even replaced the patch cord to cover all points of failure. After ...
September 19, 2024 | Rockwall, TX
We installed over thirty plenum-rated Cat 6 data cables to their new suite along with three WiFi access points and two security cameras. This customer was very happy with our work and had several more projects for us to help them with. A unique challenge on this project was the general ...
September 13, 2024 | Oklahoma City, OK
We had the opportunity to provide several solutions for this project. The first was network cabling to all the internal and external WiFi access points in the building. There were fiber total office access points, four total in the warehouse with auxiliary antennas attached. On the exterior, there were four ...
August 29, 2024 | Krum, TX
Our techs were able to efficiently install all the customer-provided Cisco equipment. We installed an LTE modem for their temporary internet connection as well as ten Wifi access points. The customer was very pleased with our installation and has us doing a second project for them.
August 29, 2024 | Fort Worth, TX
FWISD added two new state-of-the-art delay game clocks that need a multi-mode fiber optic connection. This was a fairly large project in the heat of the summer that required extensive trenching, laying new conduits, and installing fiber optic boxes. The customer was very happy with our work and had us ...
July 23, 2024 | Ponder, TX
Because there were no existing conduits between the buildings, and trenching would be cost-prohibitive, Politon provided a Ubiquiti P2P solution. The dishes were mounted facing each other in a space that would not be covered up by trucks being loaded or unloaded. Because a pre-programmed P2P device was ...
June 20, 2024 | Lucas, TX
We ran a 6 strand single mode fiber optic cable across the building, traversing varying heights and navigating around an active construction site. Once the fiber was in place, we terminated it on both ends and certified it. We have worked in both public and private schools and understand the unique ...
June 5, 2024 | Arlington, TX
Our tech installed three Cat 6 wire runs for new hosted IP phones for the Arlington store. All cables were tested and labeled and the customer was very pleased with our ease of installation and everything worked perfectly.
May 10, 2024 | Dallas, TX
We ran data cabling through three buildings on site and installed two IDF cabinets we provided to ensure full coverage and enable the customer to have a more organized network. The exterior access points were attached to arm mounts, allowing the devices to be pointed in the appropriate direction. Being ...
May 6, 2024 | Irving, TX
We provided new LC Fiber connectors on both ends as well as a bulkhead that was specific to the Panduit fiber tray that the customer already had installed. Our goal at Politon is first and foremost to provide a solution that works for our customers, and often that means working ...
April 26, 2024 | Fort Worth, TX
The initial phase of this solution is to install paging horns and ceiling speakers throughout the facility. The second phase of this project is to install SIP paging strobes and emergency push buttons that can alert the employees with a specific message on the speakers and a matching color on ...
April 16, 2024 | Haslet, TX
Over 2 weeks, we terminated and certified over 400 single-mode fiber strands. Most cabinets required a man lift to gain access. We worked closely with the customer to ensure that each IDF was standardized according to their criteria. Because we have multiple certified fiber optic technicians at Politon, we completed the job ...
March 27, 2024 | Grand Prairie, TX
We implemented a Wifi solution for both the warehouse and office areas, installing around eight Wifi access points in the warehouse and one in the office. For security purposes, we set up eight cameras in the warehouse, two in the office, and one outside the building. Hikvision cameras were chosen ...
Total: 180