Why did the customer contact us?

IPSY needs six more network cables to run to a manager area on the production floor.

Solutions provided:

Our techs ran six Cat 6 network cables from the production area for several manager desks in a bull pen-type area back to the server room.  We provided surface mount  2 port Leviton boxes at each of the three desks.  The customer was happy with the completed work.  The only challenge was running the cable through the second floor down to the data room through a shaft in the men's bathroom through an access panel.  

Team members on this project:

Jose Garcia, Caleb Polley