Completion date: January 15, 2025
Location: McKinney, TX
El Monte RV reached out to us several months ago to initiate a multi-phase IT refresh of their McKinney, Texas location. The first time we came, we installed several APs, but as you will see from the "before" image, the current setup of the MDF was not optimal. The customer needed us to bring the network equipment set-up to Politon standards.
In addition to installing a network cabinet and switch provided by the customer, we took all the necessary network equipment and consolidated all of it inside the cabinet. There were powerstrips plugged into other powerstrips and some unused equipment that was taking up space, so we cleaned that up as well so that the customer would have a better understanding of what was in-use and powering their network. We enjoy working with El Monte RV and look forward to continuing their IT refresh.
Jose Garcia, Seth Polley